Project Planning

Project Planning

This Page Is Under Construction

 

 

 

planning and drawing team

Robert A. Srote Principal

Robert A. Srote, AIA, NCARB, MBA

Robert is certified by the National Council of Architectural Registration Boards (NCARB) and the Ame...
» read more

Robert A. Srote, AIA, NCARB, MBA

principal
Joe Page Managing Architect

Joe Page, AIA, LEED AP

Joe is a well versed architect who has gained experience throughout the mid-west over a career spann...
» read more

Joe Page, AIA, LEED AP

managing architect
John D. Lark Sr. Commercial Development Manager

John D. Lark, NCARB

John has developed a broad range of project experience, including over two hundred building projects...
» read more

John D. Lark, NCARB

sr. commercial development manager
Rick Hoehne Director of Structural Engineering

Rick Hoehne, PE

Rick, attended the University of Kansas where he received Bachelor of Science degrees in both Archit...
» read more

Rick Hoehne, PE

director of structural engineering
Scott Krejci Sr. Project Architect

Scott Krejci, AIA

Scott Krejci, a licensed and recognized architect in the states of Missouri and Illinois, contribute...
» read more

Scott Krejci, AIA

sr. project architect
Kevin Noonan Sr. Project Architect

Kevin Noonan, RA

Kevin graduated from Kansas University in 1987 with a Bachelor of Architecture. He is a licensed ar...
» read more

Kevin Noonan, RA

sr. project architect
Christine Chirco Project Manager

Christine Chirco, LEED Green Assoc., NCIDQ

Christine earned her Master of Architecture degree from the University of Kansas in 2013 after compl...
» read more

Christine Chirco, LEED Green Assoc., NCIDQ

project manager
Austin Bosecker Intern Architect

Austin Bosecker

Austin, a graduate of the University of Kansas School of Architecture and Design with a Master's Deg...
» read more

Austin Bosecker

intern architect

 

planning and drawing projects

  • Construction Documents for Master Bedroom built ins

    Construction Documents

    The construction document phase begins when all parties are satisfied with the design presented. It invol...

  • Custom home design architect rendering

    Digital Renderings

    Digital renderings are excellent tools for helping Clients fully understand the proposed built environmen...

inspiring design that moves you ®